Kamoa-Kakula Copper Complex

Our portfolio of tier-one assets provides exposure to copper, platinum-group metals, nickel, zinc and other metals essential for the world’s transition to clean energy and a low-carbon economy. Our stakeholders benefit from long-life projects with low costs, low-capital intensity and leading ESG programs.

Democratic Republic of the Congo

Kamoa-Kakula Copper Complex

Ownership: Ivanhoe Mines 39.6%
Zijin Mining 39.6% | Crystal River 0.8% | DRC Government 20%

Kamoa-Kakula is one of the world’s highest-grade and lowest-carbon-intensive major copper mine. Located in the Central African Copperbelt, the complex has been in commercial production since July 1, 2021, and has continued to expand through the commissioning of its Phase 2 and Phase 3 concentrators and its state-of-the-art, direct-to-blister copper smelter. Kamoa-Kakula produced 388,838 tonnes of copper in concentrate in 2025, and the current plan, including Phase 4, targets annualized copper production of approximately 500,000 tonnes from 2029 onward, reinforcing its position as a large-scale, long-life copper producer.

$3.28 Billion

Record annual revenue recognized in 2025

$1.45 Billion

Kamoa-Kakula's EBITDA for 2025

388,838

Tonnes of copper produced in 2025

290kt

Kamoa-Kakula's 2026 copper production guidance

$2.16

Kamoa-Kakula 2025 cash cost per lb. of copper

$2.60 - $3.00

Kamoa-Kakula's 2026 cash cost guidance per lb. of copper

The Kamoa-Kakula Copper Mine — a joint venture between Ivanhoe Mines (39.6%), Zijin Mining Group (39.6%), Crystal River Global Limited (0.8%) and the Government of the Democratic Republic of Congo (20%) — is a very large, near-surface, flat-lying, stratiform copper deposit with adjacent prospective exploration areas within the Central African Copperbelt, approximately 25 kilometres west of the town of Kolwezi and about 270 kilometres west of the provincial capital of Lubumbashi.

Kamoa-Kakula began producing copper concentrates in May 2021 and commercial production on July 1, 2021.  The complex has expanded through the commissioning of its Phase 2 and Phase 3 concentrators.  On June 10, 2024 first concentrate production from the Phase 3 concentrator was achieved, months ahead of schedule and reached commercial production early in Q3, 2024.   In 2025, the complex produced 388,838 tonnes of copper in concentrate.

Copper production is expected to ramp up to 400,000 to 450,000 tonnes per annum from 2028 onwards. The planned Phase 4 expansion is expected to further increase and sustain production at approximately 500,000 tonnes per annum, which would rank Kamoa-Kakula among the world’s top three copper-producing complexes. Detailed engineering design for the Phase 4 concentrator is expected to commence in Q1 2027, with construction anticipated to take approximately 18 to 24 months from project approval.

The on-site 500,000-tonne-per-annum direct-to-blister copper smelter started operations in late 2025 and is the largest copper smelter on the African continent.  The smelter produces 99.7%-pure copper anodes, significantly reducing the need to transport copper concentrates for third-party processing.  It also produces high-strength sulphuric acid as a byproduct, which is sold to nearby mining operations on the DRC Copperbelt.  All future smelter output is already covered under offtake agreements.

Kamoa-Kakula is powered by clean, renewable hydroelectricity, complemented by on-site solar photovoltaic (PV) facilities and a battery energy storage system (BESS) that delivers 60 megawatts (MW) of continuous baseload power to the complex.  Plans are advancing to double on-site hybrid solar capacity to 120 MW by the end of Q1 2028.

 

Africa's largest smelter

The start-up of Kamoa-Kakula’s on-site 500,000-tonne-per-annum direct-to-blister copper smelter commenced on November 21, 2025. The smelter achieved first anode production on December 29, 2025 - just five weeks after heat-up and one week after the first feed of concentrate - marking a major operational milestone and a rapid, well-executed commissioning phase.

2023 Pre Feasibility Study assess an increase in production capacity

Kamoa-Kakula's 2023 PFS evaluates a staged increase in production capacity Kamoa-Kakula from the current nominal throughput rate of 7.6 Mtpa up to a total of 19.2 Mtpa by 2030.

Mine life extension to 42 years

The Kamoa-Kakula 2023 preliminary economic assessment (PEA) projects a nine-year mine life extension of the Kamoa-Kakula Copper Complex, in addition to the Kamoa-Kakula 2023 pre-feasibility study of 33 years. This case includes the addition of four new underground mines in the Kamoa area (called Kamoa 3, 4, 5 and 6) to maintain the overall production rate of up to 19.2 Mtpa.

Technical Reports

View document library
Kamoa-Kakula Mineral Reserve & Mineral Resource Update Technical Report, March 2026
Kamoa-Kakula Integrated Development Plan 2023
Kamoa-Kakula Integrated Development Plan, October 2020

Recent Press Releases

View all press releases
Ivanhoe Mines Issues 2023 Fourth Quarter and Annual Financial Results, Overview of Construction and Exploration Activities
Ivanhoe Mines recognized profit of $303 million, record normalized profit of $388 million and record adjusted EBITDA...
Read more
Ivanhoe Mines Provides 2023 Production Results and 2024 Production Guidance for the Kamoa-Kakula Copper Complex
Kamoa-Kakula produced 393,551 tonnes of copper in concentrate in 2023, within guidance Year-over-year copper production increased...
Read more